Imprint and privacy policy  |  DE  |  EN
Projects: Ingenieurbüro Feldmann + Weynand

ENGINEERING STRUCTURES & BRIDGES

Highway expansion A7 - ARGE A7 Hamburg 2014 - 2016
Project and structural planning of the noise absorption walls

Rope mesh sculpture “in orbit” - Tomas Saraceno Düsseldorf 2013 - 2014
Proof engineering service

Crane bridges 2011 - 2014
Determination of residual life time

Power Station Neyveli Indian 2014
Seismic design according to EN 1998

Jade Weser Port Wilhelmshaven 2012
Investigations of steel sheet piling

Oskarsham 2 Norway 2012
Design of bearings

Railway Bridge Neckar Stuttgart 2011
Fatigue verification

Pedestrian Bridge “Slinky springs to fame” Oberhausen 2010 - 2011
Proof engineering services

The Wave 2014
Pre-design

Kruisschansbrug Haven Antwerp 2009
On-site measurements + Refurbishment planning

Rehabilitation Kruisschansbrug Antwerp 2010 - 2013
General planning LP 1-5

Composite bridge with integral abutment A44 Ratingen 2010 - 2011
Proof engineering services

Graf-Bismarck Hafenbrücke Gelsenkirchen 2009 - 2011
Expertise + Consulting

Elbebrücke Niederwartha Niederwartha 2009
On-site measurements

Bridge crossing Galehnsche Straße Bochum 2006
On-site measurements + Planning

Pedestrian bridge Kehl-Straßburg 2003
Consulting + Planning

Platforms for wasre gas constructions 2013 - 2014
Structural analyses

Doppelmayr cable cars 2013
Support in obtaining an approval (abZ)

Offshore wind energy plants 2013
Expertise

Rail track structure quenching towers HKM Duisburg 2014
Expertise concerning fracture toughness

Galileo transmitting masts Aachen 2014
Expertise concerning stability and serviceability

Sensortragebogen Meppen 2013
Proof engineering service

Steam turbine generator Abu Dhabi 2013
Verifications of fasteners

Power Station Bellefontaine Martinique, French Antilles 2011 - 2012
Design concepts for seismic loads

Overhead noise barrier BAB A1 Köln/Lövenich 2007-2013
Proof engineering service - Steel + glass